Actively Managing Flow in Kanban: Blockers, Aging and Flow Reviews
Project Management PART 06

Actively Managing Flow in Kanban: Blockers, Aging and Flow Reviews

Actively managing flow means reading the board right to left from the oldest item every day, escalating blocked work, limiting expedite and finding the bottleneck with data. We compute CFD band widths from Bookstore data in C#, see how Code Review became the bottleneck in July, how the Theory of Constraints steps solved it (p85 from 16 to 11 days), and why the next constraint is the deploy rhythm.

8 Nov 2026 12 min 5
WIP Limits and Little's Law: Start Less, Finish More
Project Management PART 03

WIP Limits and Little's Law: Start Less, Finish More

With throughput fixed, raising WIP stretches cycle time by the same factor; Little's Law is the arithmetic behind it. In our C# simulation, raising WIP from 3 to 10 takes average cycle time from 2.4 to 7.9 days, and adding context switching cuts throughput too. We cover Little's Law's assumptions, why it is not a forecasting tool, how to set a first WIP limit and pitfalls like per-person limits.

8 Nov 2026 11 min 5
What Is Kanban? From Toyota to Software, and Why It's More Than a Board
Project Management PART 01

What Is Kanban? From Toyota to Software, and Why It's More Than a Board

Kanban is not a board but a strategy that optimizes the flow of value by limiting WIP; the board only makes it visible. Using the Bookstore support team's board, we trace the path from Toyota's pull system to Anderson's work at Microsoft and Corbis, compare the Kanban Method with The Kanban Guide 2025.5, and introduce the Guide's three practices and four flow metrics.

8 Nov 2026 10 min 4
The Daily Scrum: A 15-Minute Planning Event, Not a Status Report
Project Management PART 05

The Daily Scrum: A 15-Minute Planning Event, Not a Status Report

The Daily Scrum is a 15-minute planning event in which the Developers inspect progress toward the Sprint Goal and adapt the Sprint Backlog; its output is an actionable plan for the next day, not a report. The post covers why the three questions were removed in 2020, a format that walks the board from right to left and looks at item age, practices for remote and hybrid teams, and the traps of reporting to managers, problem solving and overruns.

8 Nov 2026 8 min 4